Notes:
3825 SQ FT, CIFO / NICOLE DAY SPA
8/4/2005 12:00:00 AM
DENIED PERMIT-NEED TDLR#, LIGHTING & MECHANICAL ENERGY ANALYSIS, CODE COMPLIANCE, ELECTRICAL AND PLUMBING APPLICATIONS,ELECTRICAL PLANS & RISER, PLUMBING RISER, AND MECHANICAL CONTRACTOR NOT REGISTERED.
(8-22-05 Jm)
1. add correct exit signs
2. need to clarify object in wet room, this area is not ada accessible.
3. storage rm.----one hour construction, 45 minute door.
4. missing wall detail, no UL corresponding detail.
5. electrical panels----install on adjacent wall or furr out this wall with 3 5/8" metal studs with 5/8" gypsum.
6. clarify reception area, maintain 44" behind desk, clarify benches? for patrons.
7. must maintain 44" corridors and egress, see print.
8. must maintain 48" clear floor area from sink drain before door sweep at restrooms.
9. missing wall detail (A4 sheet).
10. provide hi/lo drinking fountain.
8-26-05 jm)
plan is approved as re-submitted.
see notes on original denial, these issues have been corrected.
(1/19/2006 10:13 MBW) changed electrical contractor to mike chandler electric per building owner.