Notes:
1180 SQ FT, CIFO / FOX'S PIZZA
8/13/2005 12:00:00 AM
1. 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to deck & fire caulked.
3. no plbg. permitted in 1 hour demising wall and 1 hour fire wall assembly, wall must be furred out, with 3 5/8" mtl. stud with 5/8" gypsum.
4. maintain 36" corridor between entry & exit.
5. tempered glass within 2' of door.
6. Need high/low drinking fountain, bottled water may be provided in lieu of drinking fountains per IPC 2000 section 410.
7. Need to add correct ADA restroom and TAS compliance.
**CONTINGENT UPON COMPLIANCE WITH REVIEW COMMENTS, CODE REQUIREMENT AND PERTINENT LEGISLATIONS.
LICENSED SUBCONTRACTORS MUST BE REGISTERED WITH THE CITY OF FRISCO BEFORE BEGINNING ANY WORK. SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
REFER TO APPROVED PLANS FOR NOTES.
ALL SUBCONTRACTORS MUST VALIDATE AND OBTAIN CURRENT REGISTRATION WITH THE CITY PRIOR TO START OF PROJECT.
(8/16/2005 10:15 JS) (8/16/2005 09:43 JS)
PLEASE COMPLY WITH HEALTH ORDINANCE # 00-03-19 AND SMOKING ORDINANCE #00-12-12.
(8/16/2005 09:47 JS)
WH SIZE TO BE 60 GAL MIN. HIGH RECOVERY.FLOOR FINISH TO INCLUDE COVED TILE BASE. WALL FINISH TO BE NON-POROUS, SANITIZABLE. GREASE TRAP TO BE LOCATED EXTERIOR/INGROUND OR OUTSIDE PREP AREA, INGROUND. PROVIDE SMOKING SIGNAGE PER ORD. #00-12-12. ALL EQUIPMENT SHALL HAVE ANSI-SANITATION APPROVED LISTING.12'' SPLASH REQUIRED WHERE SINKS ABUTT.
(8/16/2005 15:35 SEL) **MECHANICAL AND PLUMBING CONTRACTORS ARE WITH MICHELE. WHEN THEY UPDATE THEIR REGISTER, PLEASE PULL PERMIT AND GIVE TO CONTRACTOR.