Notes:
2221 AC, 2805 SF, SFR / 2 STORY
7/18/2005 12:00:00 AM
01. ***ENERGY STAR***
02. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 28"D.
23. GARAGE MUST BE A MIN. 18'W X 20'D CLEAR SHEET ROCK TO SHEET ROCK.
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
34. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
38. 1 HOUR FIRE WALL ASSEMBLY REQ'D - SUBMIT DESIGN PRIOR TO WALL CONSTRUCTION.
41. TWO-HOUR FIRE SEPERATION REQUIRED.
43. SEE SOUND TRANSMISSION CODE COMPLIANCE DATA SHEET ATTACHED.
44. CO DETECTORS REQ'D ON ELECT LEGEND & ELECT PLAN 1/1000 SQ FT & 1 PER FLOOR MIN PLUS (1) ADD'L AT GARAGE ENTRY IN AC AREA.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
57. AUTOMATIC FIRE PROTECTION SPRINKLERS REQ'D W/ DESIGN & INSTALLATION APPROVED BY FIRE MARSHAL.
2nd level: kitchen, dining, living, mstr. bdrm. 1.5 ba.
place meters 3' from driveway or install pipe bollards
2" curb between ea. units
maintain correct vent stack roof penetrations from ea. unit