Notes:
2221 AC, 2805 SF, SFR / 2 STORY
7/14/2005 12:00:00 AM
01. ***ENERGY STAR***
02. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
08. BEAMS=10"W X 24"D.
41. TWO-HOUR FIRE SEPERATION REQUIRED.
43. SEE SOUND TRANSMISSION CODE COMPLIANCE DATA SHEET ATTACHED.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
57. AUTOMATIC FIRE PROTECTION SPRINKLERS REQ'D W/ DESIGN & INSTALLATION APPROVED BY FIRE MARSHAL.
FRISCO RECOMMENDS A CONCRETE 2" CURB SEPERATION TO PREVENT FLOODING BETWEEN UNITS
BEAMS 20"X26" UNDER PARTY WALL LOT LINES.
FIRE PLACE VENTS AND ALL OTHERS MUST PENETRATE THE ROOF AT LEAST 4 FEET FROM A PARTY WALL.