Notes:
5409 AC, 6148 SF, SFR 2 STORY
7/5/2005 12:00:00 AM
02. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
12. BEAMS=10"W X 30"D.
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
34. EXTERIOR TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
(7/5/2005 10:59 VI)
2-#4s IN THE BOTTOM OF ALL BEAMS THAT DONOT CONTAIN 2 BEAMS STRANDS.
(7/12/2005 15:31 JM)
THIS PLAN WAS REVISED, MEDIA ROOM SQ. FOOTAGE IS NOW 398 SO THAT BLDR. WILL NOT HAVE TO INSTALL FIRE SPRINKLER.
A/C & GARAGE 5997*