Notes:
8768 SQ FT, CIFO / HALL OFFICE PARK SPEC SPACE "A"
4/30/2005 12:00:00 AM
1. 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides from slab to deck.
4. 20 minute door.
5. 45 minute door.
6. 1 hour door.
fire sprinklers required
one hour fire/smoke corridor
CONTINGENT UPON COMPLIANCE WITH REVIEW COMMENTS, CODE REQUIREMENT AND PERTINENT LEGISLATIONS.
LICENSED SUBCONTRACTORS MUST BE REGISTERED WITH THE CITY OF FRISCO BEFORE BEGINNING ANY WORK. SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
REFER TO APPROVED PLANS FOR NOTES.
9-28-05 jm)
this is an addendum to b05-1262
1. one hour demising wall with 3 5/8" mtl. studs with 5/8" type x gypsum on both sides to ceiling.
2. breakroom is added with dishwasher, sink & disposal.
3. telephone server room, one hour enclosure is not required.