Notes:
9539 AC, 11,167 SQ FT SFR / 2STORY
2/1/2007 12:00:00 AM
02. COMPLIANCE WITH THE 2003 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
12. BEAMS=10"W X 30"D.
20. W/12" DIA. PIERS W/(1) #5 REBAR.
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
33. MEDIA ROOM WITH CLOTHING STORAGE MUST HAVE A CODE COMPLIANT EGRESS WINDOW.
34. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
35. 2 X 6 PLUMBING (VENT STACK/WASTE) WALLS REQ'D AT ALL FIXTURES.
44. CO DETECTORS REQ'D ON ELECT LEGEND & ELECT PLAN 1/1000 SQ FT & 1 PER FLOOR MIN PLUS (1) ADD'L AT GARAGE ENTRY IN AC AREA.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
57. AUTOMATIC FIRE PROTECTION SPRINKLERS REQ'D W/ DESIGN & INSTALLATION APPROVED BY FIRE MARSHAL.
58. COMPLIANCE WITH THE US DEPT OF ENERGY (01/23/06 REQUIRMENTS) AND 2003 IECC REQUIRED. 13 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2003 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
60. BUILDER CAUTION: CONSTRUCTION NOT CONFORMING TO THE ABOVE PERMIT REQUIRMENTS COULD RESULT IN C.O. DELAY OR POSSIBLE DENIAL
13 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2003 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
A) 2ND LEVEL: 3 BDRM. 3.5 BA. LAUNDRY, MEDIA, GAME, BONUS & 1 UNFINISHED ATTIC
B) NEED FLOOR DRAIN U/S LAUNDRY
C) RECOMMENDATION: NO CHIMNEY THRU HIP RAFTER, BAD DESIGN
D) TEMPERED WINDOWS WHERE REQ'D.