Notes:
5022 AC, 6155 SQ FT, SFR / 2 STORY
11/30/2004 12:00:00 AM
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 28"D.
20. W/12" DIA. PIERS W/(1) #5 REBAR
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
42. PROVIDE SOIL MOISTURE TREATMENT DOCUMENTATION PRIOR TO STARTING CONSTRUCTION.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
51. "ASCE" REQUIRES TOP AND / OR BOTTOM BEAM REBAR PER 5.2.2.3 d.
56. LETTERS OF ACCEPTANCE REQUIRED FROM BOTH ENGINEERS FOR CO.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
* PER PERMIT AND BUILDERS PLAN, A/C AND GARAGE 5740 SQUARE FEET
(5/8/2008 16:35 PDC) UPON REQUEST FROM BUILDER, PERMIT WAS EXTENDED.