Notes:
PIERS ARE REQUIRED WITH 4-#5 REBAR IN EACH.
POOL IN THE CENTER OF THE RESIDENCE IS WITHOUT ROOF COVER.
UNFINNISHED ATTIC STORAGE REQUIRES ONLY ONE LIGHT AND SWITCH.(11/29/2004 11:42 VI)
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
9. BEAMS=10"W X 26"D.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
57. AUTOMATIC FIRE PROTECTION SPRINKLERS REQ'D W/ DESIGN & INSTALLATION APPROVED BY FIRE MARSHAL.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
5388 AC, 6928 SQ FT, SFR / 2 STORY