2252 AC, 2723 SQ FT, SFR / 2 STORY
10/18/2004 12:00:00 AM
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 28"D.
23. GARAGE MUST BE A MIN. 18'W X 20'D CLEAR SHEET ROCK TO SHEET ROCK.
32. SECOND FLOOR SIDING AREA MUST NOT EXCEED 50% OF THE TOTAL NET EXPOSED WALL AREA.
34. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
37. R-19 VERTICAL WALL INSULATION REQUIRES 2 X 6 STUDS.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
(10/18/2004 13:43 JC)2nd. floor with (2) bedrooms, (1) bath and game room. Garage must be 18' x 20' clear. Relocate H.W. heater if necessary.(10/17/2004 08:26 JC)(2) sets of plans req'd.