Notes:
1. ***ENERGY STAR***
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
34. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
(4/28/2004 07:44 SOM)1ST FLOOR AT GARAGE BREEZEWAY MUST BE 100% MASONRY NOT SIDING
5263 AC, 6504 SQ FT, SFR \ 2 STORY