Notes:
3594 AC, 4060 SQ FT, SFR \ 2 STORY
5/5/2004 12:00:00 AM
1. ***ENERGY STAR***
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 28"D.
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
31. SIDING OVER MASONRY AT SECOND STORY NOT ALLOWED.
35. 2 X 6 PLUMBING (VENT STACK/WASTE)WALLS REQ'D.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
51. "ASCE" REQUIRES TOP AND / OR BOTTOM BEAM REBAR PER 5.2.2.3 d.
(5/5/2004 13:36 VI)
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
59. INCLUDED IN THIS PERMIT PACK IS A DRAWING AND SPECIFICATION OF THE REQUIRED BATTIER-FREE RAMP.
FOUNDATION REQUIRES #6 REBAR AT BOTTOM OF BEAMS(SEE FOUNDATION NOTES).