Notes:
1. ***ENERGY STAR***
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
8. BEAMS=10"W X 24"D.
31. SIDING OVER MASONRY AT SECOND STORY NOT ALLOWED.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
(2/23/2004 10:13 SOM)WATER METER OR VALVE BOS NOT PERMITTED IN CONCRETE DRIVE
SECOND FLOOR WITH OPTIONAL MEDIA ROOM
2985 AC, 3539 SQ FT, SFR \ 2 STORY