Notes:
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 28"D.
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
27. TEMPERED GLASS REQ'D AT STAIR LANDING WINDOW(S).
35. 2 X 6 PLUMBING (VENT STACK/WASTE)WALLS REQ'D.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
(2/11/2004 15:07 SOM)SECOND FLOOR WITH 3 BEDROOM, 2 BATH AND GAMEROOM
ENGINEERED LETTER MUST REFRENCE BOTH FRAMING INSPECTION AND DESIGN
2072 AC, 3583 SQ FT, SFR \ 2 STORY