Notes:
5630 SQ FT, CNEW / BANK ONE
3/12/2004 12:00:00 AM
JBJ SERVICES TO ALSO BE COMPLETING PLUMBING.
1- CONTINGENT UPON COMPLIANCE WITH APPROVED FINAL SITE PLAN FROM P+Z, ENGG & FIRE DEPARTMENTS, BLDG CODE & LOCAL REQUIREMENTS, PERTINENT LEGISLATIONS AND ALL REVIEW COMMENTS.
2- TRASH ROOM INSIDE THE BLDG TO BE PROVIDED WITH 2 HR FIRE RATED WALLS & CLG & SPRINKLERED AS REQ'D. ALSO DOOR 113 TO BE 90 MINUTE WITH 2 HR FRAME.
3- COMPLEMENTING THE INTERNAL TRASH ROOM SYSTEM, ONE EXTERNAL SINGLE-CONTAINER DUMPSTER ENCLOSURE FACILITY IS TO BE PROVIDED FOR RECYCLABLE & PERISHABLE WASTE AS PER STANDARD CITY CRITERIA AND BE APPROVED BY THE ENVIRONM'L SVCS DEPT. (THE REQ'D SPACE FOR THE FACILITY NEEDS ALSO APPROVAL FOR THE NECESSARY LAYOUT ADJUSTMENTS @ THE SITE'S RETAINING WALL).
4- DRIVE-THRU CANOPY TO HAVE SLOPED METAL ROOF TO MATCH BLDG'S ROOF.
5- SEPARATION WALL BETWEEN DRIVE-THRU CANOPY & OFFICE BLDG TO BE FIRE RATED 1 OR 2 HR UL-U423 AS PER REVIEW COMMENTS.
6- USE APPROVED ARCHITECTURAL FEATURES TO CONCEAL ROOF-RELATED MECH'L EQUIPMENT EXCEPT FOR APPROVED LOUVERS, VENTS OR FLUES WHICH MUST BE PAINTED TO MATCH ROOF COLOR.
7- WALLS & CLG OF ELECT'L ROOM TO BE 1 HR RATED WITH 45 MIN./1 HR FRAME SWINGING-OUT DOOR.
8- SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
(3/1/2004 09:30 MBW) GENERAL CONTRACTOR & SUBS MUST BE REGISTERED WITH THE CITY OF FRISCO PRIOR TO START OF PROJECT.