Notes:
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS10. BEAMS=10"W X 28"D.25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.42. PROVIDE SOIL MOISTURE TREATMENT DOCUMENTATION PRIOR TO STARTING CONSTRUCTION.46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.(1/14/2004 12:41 SOM)FUTURE SUBMITTALS ON NEW PERMIT APPLICATION REQUIRED
2091 AC, 2667 SQ FT, SFR / 1 STORY