Notes:
3904 AC, 4574 SQ FT, SFR / 2 STORY
12/21/2003 12:00:00 AM
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
9. BEAMS=10"W X 26"D.
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
28. TEMPERED GLASS REQ'D AT WINDOW ADJ TO STAIR.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
)BEAMS WITH (3)#5 REBAR IN EACH BOTTOM.
SECOND FLOOR WITH 3 BEDROOMS, 2 BATHROOMS, LIBRARY LOFT AND GAMEROOM.
ENGINEERED CHIMNEY FRAME REQUIRED.
FUTURE SUBMITTALS MAY BE REJECTED.