Notes:
2069 AC, 2625 SQ FT, SFR / 1 STORY
12/4/2003 12:00:00 AM
1. ***ENERGY STAR***
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
12. BEAMS=10"W X 30"D.
24. EXITWAYS (HALLWAYS) MUST BE A MIN. 36"W INCLUDING ARCHED OR CASED OPENINGS. (TWO OR MORE ROOMS)
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
35. 2 X 6 PLUMBING (VENT STACK/WASTE)WALLS REQ'D.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
53. PLANS MUST BE LEGIBLE OR 24" X 36".
60. THIS SUBMITTAL NOT IN COMPLIANCE WITH APRIL 2003 CONTRACTOR GUIDELINES.
PROVIDE EXPANSION JOINTS ON MASONRY FACADE.
FUTURE PLOT PLANS MUST BE IN COMPLIANCE WITH 4-03 CONTRACTORS GUIDELINES.
ENGINEER OF RECORD MUST DATE REFERENCED GEO-TECH REPORT.