Notes:
2364 AC, 2872 SQ FT, SFR / 2 STORY
12/1/2003 12:00:00 AM
. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS9. BEAMS=10"W X 26"D.25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.35. 2 X 6 PLUMBING (VENT STACK/WASTE)WALLS REQ'D.50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.2 ND FLOOR WITH 3-BRS, 1 BATH AND LOFT ARCH AT TOP OF STAIRSPROVIDE EXPANSION JOINTS ON MASONRY FACADES.