Notes:
5141 AC, 6383 SQ FT, SFR / 2 STORY
11/16/2003 12:00:00 AM
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 28"D.
21. W/12" DIA. PIERS W/(2) #5 REBAR
27. TEMPERED GLASS REQ'D AT STAIR LANDING WINDOW(S).
44. CO DETECTORS REQ'D ON ELECT LEGEND & ELECT PLAN 1/1000 SQ FT & 1 PER FLOOR MIN PLUS (1) ADD'L AT GARAGE ENTRY IN AC AREA.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
51. "ASCE" REQUIRES TOP AND / OR BOTTOM BEAM REBAR PER 5.2.2.3 d.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
(11/16/2003 11:43 MBW)PVR REQUIRED ON ENGINEER LETTER TO PICK UP PERMIT.