3198 AC, 4157 SQ FT, SFR / 2 STORY
11/3/2003 12:00:00 AM
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
5. BEAMS=8"W X 26"D.
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
35. 2 X 6 PLUMBING (VENT STACK/WASTE)WALLS REQ'D.
44. CO DETECTORS REQ'D ON ELECT LEGEND & ELECT PLAN 1/1000 SQ FT & 1 PER FLOOR MIN PLUS (1) ADD'L AT GARAGE ENTRY IN AC AREA.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
(11/3/2003 11:20 MBW)GRADE BEAMS-(2)#4 IN ALL BEAM BOTTOMS THAT DO NOT CONTAIN BEAM BOTTOM STRANDS.