Notes:
3129 AC, 3804 SQ FT, SFR / 2 STORY
11/2/2003 12:00:00 AM
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
12. BEAMS=10"W X 30"D.
35. 2 X 6 PLUMBING (VENT STACK/WASTE)WALLS REQ'D.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
(11/2/2003 09:09 MBW)GRADE MEAMS-(2)#4 REBAR IN ALL BEAM BOTTOMS THAT O NOT CONTAIN BEAM STRANDS.
SECOND FLOOR WITH MEDIA ROOM AND 6'0"X13'6" ATTIC STORAGE.
SIDING EXCEEDS 50% AT SECOND FLOOR. CONSIDER STUCCO.