Notes:
2831 AC, 3504 SQ FT, SFR/ 2 STORY
12/8/2003 12:00:00 AM
1. ***ENERGY STAR***
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 28"D.
35. 2 X 6 PLUMBING (VENT STACK/WASTE)WALLS REQ'D.
42. PROVIDE SOIL MOISTURE TREATMENT DOCUMENTATION PRIOR TO STARTING CONSTRUCTION.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
2nd FLOOR WITH BONUS ROOM ONLY.
WINDOW WALL OF 2nd FLOOR BONUS ROOM MUST BE MASONRY.
ENGINEER OF RECORD DESIGN DRWG'S MUST BE SEALED NOT STAMPED.