Notes:
1- CONTINGENT UPON COMPLIANCE WITH P & Z/ CIVIL ENGG APPROVALS OF FINAL SITE PLAN, CODE & LOCAL REQUIREMENTS, PERTINENT LEGISLATIONS AND ALL REVIEW COMMENTS.
2- PENDING SUBMITTAL OF ASBESTOS STATEMENT AS PER HB 1927.
3- PENDING EVIDENCE OF APPROVAL FROM THE ENVIRONMENTAL SVCS DEPT. ON THE ADEQUACY OF SOLID WASTE CONTAINMENT/COLLECTION SYSTEM FOR ALL FACILITIES.
4- CONFORM TO FIRE MARSHAL'S CONDITIONS ON M.E.P.MATERIALS ALLOWED INSIDE THE CRAWL SPACE, REQ'D SPRINKLER SYST., ETC.
5- ALL STRUCTURAL STEEL IN CRAWL SPACE MUST BE CORROSION-RESISTANT AND FIREPROOFED AS REQ'D. ARCHITECT MUST SUBMIT PROPOSAL FOR A SUITABLE SYSTEM (COMPATIBLE TO BOTH PROTECTION APPLICATIONS)TO BE APPROVED PRIOR INSTALLATION.
6- ALL EXIT CORRIDOR WALLS, OR ANY OTHER WALL DEFINING THE SPACE OF A FIRE-PROTECTED EXITWAY, MUST BE 1 HR FIRE-RATED TO DECK WITH PROTECTED OPENINGS AND FIRE/SMOKE-DAMPERED DUCT PENETRATIONS AS REQ'D THROUGHOUT, IN ALL BLDGS.
7- SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
129000 SQ FT, CNEW / CCCC NEW LIBRARY & CLASSROOMS