Notes:
3588 AC, 4355 SQ FT, SFR / 2 STORY
9/30/2003 12:00:00 AM
1. ***ENERGY STAR***
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 28"D.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
51. "ASCE" REQUIRES BEAM BOTTOM REBAR 5.2.2.3 C.
55. ENGINEER OF RECORD FRAMING DESIGN SUPERSEDES BUILDERS DESIGN PLANS.
NOTE:
1. ENGINEERED FRAMING PLANS NEED ENGINEER'S SEAL FOR FUTURE SUBMITTALS.
2. ENGINEER'S LETTER NEEDS TO REFERENCE COMPLIANCE WITH APRIL 2003 FRISCO GUIDELINES IN FUTURE SUBMITTALS.
(10/7/2003 12:53 JLS) CUSTOMER'S CHECK WAS OVER BY $45; ADDED TO BALANCE ACCOUNT. COULD NOT REACH CUSTOMER.