Notes:
3981AC, 4844 SQ FT, SFR / 2 STORY
9/18/2003 12:00:00 AM
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
9. BEAMS=10"W X 26"D.
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
32. SECOND FLOOR SIDING AREA MUST NOT EXCEED 50% OF THE TOTAL NET EXPOSED WALL AREA.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.(9/18/2003 16:01 VI)
60. THIS SUBMITTAL NOT IN COMPLIANCE WITH APRIL 2003 CONTRACTOR GUIDELINES REGARDING THE ENGINEERING LETTER. WE HAVE CONTACTED LS ENGINEERING AND THE LETTER WILL BE CORRECTED FOR FUTURE SUBMITTALS.