Notes:
3974 AC, 4839 SQ FT, SFR / 2 STORY
9/4/2003 12:00:00 AM
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
6. BEAMS=8"W X 28"D.
20. W/12" DIA. PIERS W/(1) #5 REBAR
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
28. TEMPERED GLASS REQ'D AT WINDOW ADJ TO STAIR.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
60. THIS SUBMITTAL NOT IN COMPLIANCE WITH APRIL 2003 CONTRACTOR GUIDELINES.