Notes:
2769 AC, 3584 SQ FT, SFR / 2 STORY
10/6/2003 12:00:00 AM
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 28"D.
24. EXITWAYS (HALLWAYS) MUST BE A MIN. 36"W INCLUDING ARCHED OR CASED OPENINGS. (TWO OR MORE ROOMS)
35. 2 X 6 PLUMBING (VENT STACK/WASTE)WALLS REQ'D.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
(10/6/2003 09:37 MBW)(2)#6 REBAR IN ALL BEAM BOTTOMS.
REMOVE YOUR FRAMING FROM FUTURE SUBMITTALS-ONLY THE ENGINEER OF RECORD DESIGN DRAWINGS.