Notes:
2085 AC, 2551 SQ FT, SFR / 1 STORY
9/18/2003 12:00:00 AM
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 28"D.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
56. CORRECT FUTURE PLOT PLANS TO MEET 4/2003 CONTRACTORS GUIDELINE REQUIREMENTS.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
(9/18/2003 13:02 MBW)FOAN INSULATION REQUIRES A SUMMARY REPORT FROM A THIRD PARTY RATER.