Notes:
3457 AC, 4165 SQ FT, SFR / 2 STORY
8/6/2003 12:00:00 AM
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 28"D.
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
32. SECOND FLOOR SIDING AREA MUST NOT EXCEED 50% OF THE TOTAL NET EXPOSED WALL AREA.
42. PROVIDE SOIL MOISTURE TREATMENT DOCUMENTATION PRIOR TO STARTING CONSTRUCTION.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
59. WEBB FLOOR JOIST SYSTEMS AND ROOF TRUSS SYSTEMS MUST BE ENGINEERED (SEALED AND SIGNED AND APPROVED BY THE ENGINEER OF RECORD PRIOR TO SUBMITTAL FOR A BUILDING PERMIT.
(8/8/2003 14:51 JLS) CUSTOMER'S CHECK $.01 OVER; ADDED TO FEES TO BALANCE ACCOUNT.