Notes:
2559 AC, 3036 SQ FT, SFR / 2 STORY
6/28/2003 12:00:00 AM
1. ***ENERGY STAR***
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
11. BEAMS=10"W X 28"D.
50. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
51. CSST GAS PIPING PROHIBITED IN FRISCO.
52. "ENGINEER OF RECORD" LETTER MISSING OR INCOMPLETE
(6/28/2003 08:56 CLF)
AS REQUIRED WE RECOMMEND WATERPROOFING AND ADDING A FLOOR DRAIN TO THE SECOND FLOOR UTILITY ROOM .