Notes:
14/2003 08:26 JC)
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 26"D.
39. 1 HOUR FIRE WALL ASSEMBLY REQ'D - SUBMIT DESIGN PRIOR TO WALL CONSTRUCTION.
41. ON "0" SET-BACK SIDE OF HOUSE NO METERS OR VENTS ARE ALLOWED. GUTTER DOWNSPOUTS MUST DISCHARGE ONTO SAME PROPERTY 5'-0" FROM FOUNDATION.
51. CSST GAS PIPING PROHIBITED IN FRISCO.
59. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
60. WEBB FLOOR JOIST SYSTEMS AND ROOF TRUSS SYSTEMS MUST BE ENGINEERED (SEALED AND SIGNED AND APPROVED BY THE ENGINEER OF RECORD PRIOR TO SUBMITTAL FOR A BUILDING PERMIT.
3201 AC, 3689 SQ FT, SFR / 2 STORY