Notes:
1- CONTINGENT UPON FULL APPROVAL OF P+Z/CIVIL FINAL SITE PLANS.
2- COORDINATE SINGLE-CONTAINER DUMPSTER ENCLOSURE (IN ADDITION TO THE 2 HR F.R. INTERNAL TRASH ROOM) WITH THE ENVIRONMENTAL DEPT. (Contact Pippa Couvillion @ 972-335-5519).
3- CONNECT RAIN LEADERS AND DOWNSPOUTS TO STORM SYSTEM.
4- 1 HR DRIVE-THRU CANOPY STRUCTURE AND SEPARATION WALL.
5- ALL CONSTRUCTION TO BE ASBESTOS FREE AS PER STATE LEGISLATION. NO INSTALLATION ALLOWED BEFORE THE MSDS SHEETS ARE VERIFIED BY ARCHITECT AND COPIED TO BLDG DEPT.
7- SUBJECT TO FIRE MARSHAL AND FIELD INSPECTIONS.
3983 SQ FT CNEW, BANK ONE CORP