Notes:
1- CONTINGENT UPON P+Z/CIVIL APPROVAL OF FINAL SITE PLAN AND ALL CITY REVIEW COMMENTS.
2- COORDINATE DUMPSTER ENCLOSURE SYSTEM WITH THE ENVIRONMENTAL SVCS DEPT. (Contact Pippa Couvillion @ 972-335-5519).
3- ALL FOOD RELATED CONSTRUCTION ITEMS AND EQUIPMENT AS PER HEALTH & FOOD SAFETY DEPT.
4- ARCHITECT'S CERTIFICATION OF "NO CONTAINED ASBESTOS" MUST BE SUBMITTED TO VALIDATE THIS PERMIT (Senate Bill 509).
5- ARCHITECT TO VERIFY AND REPORT, BEFORE INSTALLATION, THAT THE MANUFACTURER'S "MATERIAL SAFETY DATA SHEETS" (House Bill 1927) DESCRIBE ALL MATERIALS "ASBESTOS FREE" AS REQUIRED.
6- ALL FIRE BARRIERS AND MEP PENETRATIONS TO BE PROVIDED WITH REQUIRED ASTM REFERENCE AND UL-LISTED FIRESTOPPING, FIRE SEALING AND FIRE RESISTIVE JOINT SYSTEMS AS PER APPROVED DTLS. (Related documentation must be available on site to inspectors).
7- SUBJECT TO FIRE MARSHAL AND FIELD INSPECTIONS.
138,651 SQ. FT GRIFFIN MIDDLE SCHOOL