Seal POOL
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/18/2021 PERMIT SUB-TYPE: RES POOL PERMIT NO: P20-00552
JOB ADDRESS:
14153 STRAWFLOWERS DR
FRISCO, TX 75035
DESC:   POOL AND SPA
OWNER:
PALAPARTY SRIDHAR

FRISCO TX 75035-7127

CONTRACTOR:


ISSUED DATE:
1/25/2021
APPLIED DATE:
10/8/2020
EXPIRED DATE:
4/6/2023
SITE APN:
C2707274
STATUS:
COMPLETED
APPLICANT:
METROPLEX POOLS
1608 CHAPARRAL CT
GRAPEVINE TX 76051
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
B-STEEL 04/07/2022 DC2$30.00
IN-GROUND POOL BUILDING PERMIT FEE$200.00
POOL FEE$10.00
SPA$75.00
PRE PLASTER 01/23/2023 DW2$30.00
CREDIT CARD FEE$5.70
CREDIT CARD FEE$2.40
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
B-STEEL 02/28/2022 GLQ$30.00
B-STEEL 03/23/2022 JWE2$30.00
ELECT ROUGH RES 03/23/2022 JWE2$30.00
POOL FINAL 03/21/2023 RWK$30.00
Total Fees:$474.30
______  B-STEEL
______  ELECT ROUGH RES
______  GAS AND TRAP
______  B-STEEL
______  ELECT ROUGH RES
______  D-STEEL RES
______  GAS AND NOTRAP
______  B-STEEL
______  D-STEEL RES
______  ELECT ROUGH RES
______  B-STEEL
______  D-STEEL RES
______  ELECT ROUGH RES
______  B-STEEL
______  B-STEEL
______  B-STEEL
______  ELECT ROUGH RES
______  B-STEEL
______  ELECT ROUGH RES
______  B-STEEL
______  B-STEEL
______  ELECT ROUGH RES
______  PRE PLASTER
______  PRE PLASTER
______  PRE PLASTER
______  POOL FINAL
______  POOL FINAL
______  POOL FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)