|
POOL
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/8/2008
|
PERMIT SUB-TYPE: RES POOL
|
PERMIT NO: P08-0280
|
JOB ADDRESS: 5004 THACKERY DR FRISCO, TX 75034 |
DESC:
POOL AND SPA |
|
OWNER:
OVARD RESIDENCE
5004 THACKERY DR FRISCO TX 75034
|
CONTRACTOR:
|
ISSUED DATE: 7/11/2008
APPLIED DATE:7/2/2008
EXPIRED DATE:1/7/2009
SITE APN:D247978
STATUS:COMPLETED
|
|
APPLICANT:
ARTISTIC POOLSCAPES
4 SHADY BEND DR MELISSA TX 75454
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 38000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
GAS PRESSURE 8/11/2008 | $30.00 |
CONVENIENCE FEE | $0.90 |
CONVENIENCE FEE | $0.90 |
CONVENIENCE FEE | $0.90 |
CONVENIENCE FEE | $0.90 |
CONVENIENCE FEE | $0.90 |
D-STEEL 8/19/2008 CSW | $30.00 |
SPA/ABOVE GROUND POOL PERMIT F | $50.00 |
POOL PLUMBING FEE | $20.00 |
POOL ELECTRIC FEE | $10.00 |
IN-GROUND POOL BUILDING PERMIT | $100.00 |
PRE PLASTER 9/5/2008 | $30.00 |
POOL FINAL 9/29/2008 | $30.00 |
PRE PLASTER 9/8/2008 TLB | $30.00 |
Total Fees: | $334.50 |
|
|
| ______ B-STEEL |
______ GAS PRESSURE |
______ GAS PRESSURE |
______ GAS PRESSURE |
______ D-STEEL |
______ D-STEEL |
______ PRE PLASTER |
______ PRE PLASTER |
______ PRE PLASTER |
______ GAS/TRAP |
______ POOL FINAL |
______ GAS/TRAP |
______ POOL FINAL |
______ POOL FINAL |
______ POOL FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|