|
PLUMBING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/7/2022
|
PERMIT SUB-TYPE: ALT AND ADD
|
PERMIT NO: L22-02356
|
JOB ADDRESS: 4900 PRESTON RD 110 FRISCO, TX 75034 |
DESC:
RUN GAS FROM METER TO NEW ROOFTOP UNITS |
|
OWNER:
LLC 4900P
4849 KELLER SPRINGS RD ADDISON TX 75001-5912
|
CONTRACTOR:
TEXAS PLUMBING SOLUTIONS LLC
500 E ARAPAHO RD STE 603 RICHARDSON TX 75081
|
ISSUED DATE: 10/7/2022
APPLIED DATE:10/5/2022
EXPIRED DATE:5/3/2023
SITE APN:ADD44898
STATUS:COMPLETED
|
|
APPLICANT:
Elisha French
500 E ARAPAHO RD RICHARDSON TX 75081
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PERCENT CREDIT CARD FEE | $1.40 |
PERCENT CREDIT CARD FEE | $0.70 |
AUTO PROCESSING FEE | $0.70 |
BACKFLOW | $0.00 |
FIXTURE | $0.00 |
GAS LINE | $5.00 |
PLUMBING PERMIT FEE | $30.00 |
PLUMBING LINE | $0.00 |
PRESSURE REDUCING VALVE | $0.00 |
WATER HEATER | $0.00 |
WATER SOFTENER | $0.00 |
GAS PRESSURE 10/19/2022 SDC | $35.00 |
GAS PRESSURE 10/20/2022 SDC | $35.00 |
GAS PRESSURE 10/27/2022 SDC | $35.00 |
Total Fees: | $142.80 |
|
|
| ______ PLUMBING FINAL |
______ GAS PRESSURE |
______ GAS PRESSURE |
______ GAS PRESSURE |
______ GAS PRESSURE |
______ GAS PRESSURE |
______ GAS PRESSURE |
______ GAS RELEASE |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|