|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE:
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: FD09-0079
|
JOB ADDRESS: 14051 PORT EDWARDS LN FRISCO, TX |
DESC:
3931 AC, 4636 SF, SFR / 2 STORY |
|
OWNER:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
CONTRACTOR:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
ISSUED DATE:
APPLIED DATE:12/21/2009
EXPIRED DATE:
SITE APN:D530084
STATUS:VOID
|
|
APPLICANT:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 293291.91
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
PLUMBTOPOUT/MEC 10/20/2009 | $30.00 |
2NDS/FRAMING 10/26/2009 | $30.00 |
PLUMBTOPOUT/MEC 10/22/2009 | $30.00 |
PLUMBING FINAL 12/3/2009 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $139.08 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $239.00 |
BUILDING PERMIT FEE | $1,963.75 |
FENCE FEE | $20.00 |
Total Fees: | $2,982.83 |
|
|
| ______ METER PAYMENT |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CAMERA |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ PLUMBING FINAL |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|