|
CIVIL
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE:
|
PERMIT SUB-TYPE: RESIDENTIAL SUBDIVS
|
PERMIT NO: CV02-0039
|
JOB ADDRESS: HUNTERS CREEK, PHASE 8 , |
DESC:
Hunters Creek, Phase 8 |
|
OWNER:
Hunters Creek Phase 8
12890 Hillcrest Road, Suite 10 Dallas TX 75230
|
CONTRACTOR:
GTI, MURRAY, ASHLAR
|
ISSUED DATE:
APPLIED DATE:5/16/2002
EXPIRED DATE:
SITE APN:
STATUS:FINAL ACCEPTANC
|
|
APPLICANT:
Tipton Engineering, Inc.
6330 Broadway, Suite C Garland TX 75043
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CONSTRUCTION INSPECTION FEES | $0.00 |
CONSTRUCTION PENALTY FEE | $0.00 |
CONSTRUCTION PENALTY FEE | $0.00 |
PAVING ESCROW FEE | $48,544.00 |
SATURDAY WORK FEES | $150.00 |
SATURDAY WORK FEES | $150.00 |
SATURDAY WORK FEES | $150.00 |
SATURDAY WORK FEES | $150.00 |
SATURDAY WORK FEES | $150.00 |
SATURDAY WORK FEES | $150.00 |
CONSTRUCTION INSPECTION FEES | $70,404.98 |
STREET LIGHTS ESCROW FEE | $28,761.11 |
Total Fees: | $148,610.09 |
|
|
| ______ PRECON CONF |
______ TRENCH SAFETY |
______ WATER PRESSURE TEST |
______ SATURDAY WORK |
______ PAVING MIX DESIGN |
______ WATER PRESSURE TEST |
______ SUBGRADE DENSITIES |
______ LIME DEPTH CHECK |
______ LIME GRADATION |
______ WATER SAMPLES |
______ SS LOW PRESSURE AIR |
______ SS MANDREL TEST |
______ SATURDAY WORK |
______ WATER PRESSURE TEST |
______ SS VIDEOTAPE REVIEW |
______ WATER SAMPLES |
______ SUBGRADE UTILITY REL |
______ WATER PRESSURE TEST |
______ LIME SERIES |
______ SS MANDREL TEST |
______ SS LOW PRESSURE AIR |
______ SS VIDEOTAPE REVIEW |
______ WATER SAMPLES |
______ PI TEST |
______ LIME GRADATION |
______ SUBGRADE DENSITIES |
______ LIME DEPTH CHECK |
______ SATURDAY WORK |
______ WATER SAMPLES |
______ SATURDAY WORK |
______ SATURDAY WORK |
______ SATURDAY WORK |
______ PRELIM CONST INSP |
______ BUILDING INSPECTION |
______ ENGINEERING |
______ CONSTRUCTION INSPECT |
______ PUBLIC WORKS |
______ PLANNING |
______ FINAL ACCEPTANCE LET |
______ PLANNING |
______ ENGINEERING |
______ PUBLIC WORKS |
______ BUILDING INSPECTION |
______ CONSTRUCTION INSPECT |
______ FINAL ACCEPTANCE LET |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|