CIVIL
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE:
|
PERMIT SUB-TYPE: RESIDENTIAL SUBDIVS
|
PERMIT NO: CV02-0025
|
JOB ADDRESS: MEADOWS OF PRESTON, PHASE 3 , |
DESC:
Meadows of Preston, Phase 3 |
|
OWNER:
Legacy/Monterey Homes, LP
4050 West Park Boulevard Plano TX 75093
|
CONTRACTOR:
Mario Sinacola & Sons Excavati
400 N KEALY Lewisville TX 75067
|
ISSUED DATE:
APPLIED DATE:4/9/2002
EXPIRED DATE:
SITE APN:
STATUS:FINAL ACCEPTANC
|
|
APPLICANT:
WARREN CORWIN
200 BELMONT DRIVE ALLEN TX 75013
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SATURDAY WORK FEES | $150.00 |
SATURDAY WORK FEES | $150.00 |
SATURDAY WORK FEES | $150.00 |
CONSTRUCTION INSPECTION FEES | $12,787.73 |
SATURDAY WORK FEES | $150.00 |
Total Fees: | $13,387.73 |
|
|
| ______ PRECON CONF |
______ TRENCH SAFETY |
______ SATURDAY WORK |
______ SATURDAY WORK |
______ SATURDAY WORK |
______ SS MANDREL TEST |
______ SS VIDEOTAPE REVIEW |
______ SS LOW PRESSURE AIR |
______ SS VIDEOTAPE REVIEW |
______ WATER PRESSURE TEST |
______ PAVING MIX DESIGN |
______ LIME SERIES |
______ SUBGRADE UTILITY REL |
______ WATER SAMPLES |
______ SUBGRADE DENSITIES |
______ LIME GRADATION |
______ PI TEST |
______ LIME DEPTH CHECK |
______ SATURDAY WORK |
______ PRELIM CONST INSP |
______ BUILDING INSPECTION |
______ ENGINEERING |
______ CONSTRUCTION INSPECT |
______ PLANNING |
______ PUBLIC WORKS |
______ FINAL ACCEPTANCE LET |
______ FINAL INSPECTION |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|