Seal CIVIL
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: PERMIT SUB-TYPE: COMMERCIAL DEV PERMIT NO: CV02-0022
JOB ADDRESS:
FRISCO SQUARE, PHASE 2
,
DESC:   Frisco Square, Phase 2
OWNER:
City of Frisco/Five Star Devel
6859 Main Street
Frisco TX 75034

CONTRACTOR:
Mario Sinacola & Sons Excavati
400 N KEALY
Lewisville TX 75067
ISSUED DATE:
APPLIED DATE:
4/3/2002
EXPIRED DATE:
SITE APN:
STATUS:
APPLICANT:
Hunter Associates Texas, LTD.
6990 Main Street
Frisco TX 75034
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
CONSTRUCTION INSPECTION FEES$0.00
CONSTRUCTION ESCROW FEE$0.00
CONSTRUCTION INSPECTION FEES$0.00
SATURDAY WORK FEES$0.00
CONSTRUCTION PENALTY FEE$0.00
CONSTRUCTION ESCROW FEE$0.00
CONSTRUCTION PENALTY FEE$0.00
______  PRECON CONF
______  SATURDAY WORK
______  SATURDAY WORK
______  SATURDAY WORK
______  SATURDAY WORK
______  SATURDAY WORK
______  SATURDAY WORK
______  WATER PRESSURE TEST
______  SS VIDEOTAPE REVIEW
______  SS LOW PRESSURE AIR
______  SS MANDREL TEST
______  SATURDAY WORK
______  SS LOW PRESSURE AIR
______  SS MANDREL TEST
______  SS VIDEOTAPE REVIEW
______  SATURDAY WORK
______  TREE
______  TREE
______  SATURDAY WORK
______  WATER PRESSURE TEST
______  SS VIDEOTAPE REVIEW
______  MANHOLE VACUUM TEST
______  PRELIM CONST INSP
______  PLANNING
______  ENGINEERING
______  BUILDING INSPECTION
______  CONSTRUCTION INSPECT
______  PUBLIC WORKS
______  FINAL ACCEPTANCE LET
______  FINAL INSPECTION
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)