Seal CIVIL
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: PERMIT SUB-TYPE: RESIDENTIAL SUBDIVS PERMIT NO: CV-0422
JOB ADDRESS:
GRIFFIN PARC, PHASE 3
,
DESC:   Griffin Parc, Phase 3
OWNER:
BLACKARD INDUSTRIES, INC
5385 FM 2934
Frisco TX 75034

CONTRACTOR:
L.H. Lacy
10888 Shady Trail P.O. Box 54
Dallas TX 753541297
ISSUED DATE:
APPLIED DATE:
11/30/2000 2:10:24 PM
EXPIRED DATE:
SITE APN:
STATUS:
FINAL ACCEPTANC
APPLICANT:
JONES & BOYD, INC
16800 Dallas Parkway, Suite 24
Dallas TX 75248
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
CONSTRUCTION INSPECTION FEES$11,581.08
SATURDAY WORK FEES$150.00
Total Fees:$11,731.08
______  PRECON CONF
______  TRENCH SAFETY
______  TRENCH SAFETY
______  SS VIDEOTAPE REVIEW
______  SS LOW PRESSURE AIR
______  SS MANDREL TEST
______  WATER PRESSURE TEST
______  SATURDAY WORK
______  WATER SAMPLES
______  SUBGRADE UTILITY REL
______  SULFATE TESTING
______  LIME SERIES
______  PAVING MIX DESIGN
______  PAVING MIX DESIGN
______  PAVING MIX DESIGN
______  PAVING MIX DESIGN
______  SATURDAY WORK
______  PAVING CORES
______  PRELIM CONST INSP
______  BUILDING INSPECTION
______  PLANNING
______  ENGINEERING
______  CONSTRUCTION INSPECT
______  FINAL ACCEPTANCE LET
______  PUBLIC WORKS
______  FINAL INSPECTION
______  PI TEST
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)