|
CIVIL
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE:
|
PERMIT SUB-TYPE: RESIDENTIAL SUBDIVS
|
PERMIT NO: CV-0413
|
JOB ADDRESS: KINGS GARDEN, PHASE 3 , |
DESC:
Kings Garden, Phase 3 |
|
OWNER:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
CONTRACTOR:
SITE/HODGSON
|
ISSUED DATE:
APPLIED DATE:11/30/2000 1:58:41 PM
EXPIRED DATE:
SITE APN:
STATUS:FINAL ACCEPTANC
|
|
APPLICANT:
Jones & Boyd, Inc
16800 Dallas Parkway, Suite 24 Dallas TX 75248
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SATURDAY WORK FEES | $150.00 |
CONSTRUCTION INSPECTION FEES | $30,806.93 |
SATURDAY WORK FEES | $150.00 |
SATURDAY WORK FEES | $150.00 |
Total Fees: | $31,256.93 |
|
|
| ______ PRECON CONF |
______ TRENCH SAFETY |
______ SATURDAY WORK |
______ SS VIDEOTAPE REVIEW |
______ WATER PRESSURE TEST |
______ SS MANDREL TEST |
______ SS LOW PRESSURE AIR |
______ SS VIDEOTAPE REVIEW |
______ SULFATE TESTING |
______ LIME SERIES |
______ SUBGRADE UTILITY REL |
______ SATURDAY WORK |
______ PAVING MIX DESIGN |
______ PAVING MIX DESIGN |
______ SATURDAY WORK |
______ PRELIM CONST INSP |
______ WATER PRESSURE TEST |
______ BUILDING INSPECTION |
______ CONSTRUCTION INSPECT |
______ ENGINEERING |
______ PLANNING |
______ PUBLIC WORKS |
______ FINAL ACCEPTANCE LET |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|