|
DEVPROJ
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE:
|
PERMIT SUB-TYPE:
|
PERMIT NO: CV-0397
|
JOB ADDRESS: LAKES OF PRESTON VINEYARDS VIL , |
DESC:
Lakes of Preston Vineyards Village, Phase 5 |
|
OWNER:
DOUGLAS PROPERTIES
|
CONTRACTOR:
SITE CONCRETE, INC.
PO Box 154489 Irving TX 750154489
|
ISSUED DATE: 6/7/2001
APPLIED DATE:11/3/2000 11:11:36 AM
EXPIRED DATE:
SITE APN:
STATUS:CA 2/8/02
|
|
APPLICANT:
TIPTON ENGINEERING, INC.
6330 Broadway Boulevard
Suite GARLAND TX 75043
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CONSTRUCTION INSPECTION FEES | $24,738.27 |
CONSTRUCTION INSPECTION FEES | $150.00 |
SATURDAY WORK FEES | $150.00 |
SATURDAY WORK FEES | $150.00 |
SATURDAY WORK FEES | $150.00 |
Total Fees: | $25,338.27 |
|
|
| ______ SATURDAY WORK |
______ TRENCH SAFETY |
______ SATURDAY WORK |
______ WATER PRESSURE TEST |
______ SS LOW PRESSURE AIR |
______ SS MANDREL TEST |
______ SS VIDEOTAPE REVIEW |
______ LIME SERIES |
______ SUBGRADE UTILITY REL |
______ SATURDAY WORK |
______ PI TEST |
______ SULFATE TESTING |
______ PAVING MIX DESIGN |
______ SATURDAY WORK |
______ PRELIM CONST INSP |
______ BUILDING INSPECTION |
______ CONSTRUCTION INSPECT |
______ FINAL ACCEPTANCE LET |
______ PLANNING |
______ ENGINEERING |
______ FINAL CONST INSPECTI |
______ WATER DENSITIES |
______ PRECON |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|