|
CIVIL
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE:
|
PERMIT SUB-TYPE: COMMERCIAL DEV
|
PERMIT NO: CV-0382
|
JOB ADDRESS: HALL OFFICE PARK, PHASE G3 , |
DESC:
Hall Office Park, Phase G3 |
|
OWNER:
Hall Financial Group
2595 Dallas Parkway, Suite 300 Frisco TX 75034
|
CONTRACTOR:
AUSTIN COMMERCIAL
3535 TRAVIS ST DALLAS TX 75204
|
ISSUED DATE:
APPLIED DATE:8/14/2000
EXPIRED DATE:
SITE APN:
STATUS:
|
|
APPLICANT:
Jones & Boyd, Inc
16800 Dallas Parkway, Suite 24 Dallas TX 75248
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CONSTRUCTION INSPECTION FEES | $2,141.25 |
Total Fees: | $2,141.25 |
|
|
| ______ PRECON CONF |
______ TRENCH SAFETY |
______ WATER PRESSURE TEST |
______ SS LOW PRESSURE AIR |
______ WATER PRESSURE TEST |
______ WATER SAMPLES |
______ SS MANDREL TEST |
______ SS VIDEOTAPE REVIEW |
______ SUBGRADE UTILITY REL |
______ PAVING MIX DESIGN |
______ SULFATE TESTING |
______ LIME SERIES |
______ PAVING MIX DESIGN |
______ PAVING MIX DESIGN |
______ PAVING MIX DESIGN |
______ PAVING MIX DESIGN |
______ PRELIM CONST INSP |
______ PUBLIC WORKS |
______ PLANNING |
______ CONSTRUCTION INSPECT |
______ FINAL ACCEPTANCE LET |
______ FINAL INSPECTION |
______ BUILDING INSPECTION |
______ ENGINEERING |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|