|
DEVPROJ
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE:
|
PERMIT SUB-TYPE: RESIDENTIAL SUBDIVS
|
PERMIT NO: CV-0319
|
JOB ADDRESS: HERITAGE LAKES, PHASE 3 , |
DESC:
Heritage Lakes, Phase 3 |
|
OWNER:
BLACKARD INDUSTRIES, INC
5385 FM 2934 Frisco Tx 75034
|
CONTRACTOR:
L.H. LACY
10888 Shady Trail
P.O. Box 54 Dallas TX 753541297
|
ISSUED DATE: 4/26/2001
APPLIED DATE:8/7/2000 6:21:32 PM
EXPIRED DATE:
SITE APN:
STATUS:FA 10/1/01
|
|
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CONSTRUCTION INSPECTION FEES | $150.00 |
CONSTRUCTION INSPECTION FEES-P | $13,368.67 |
CONSTRUCTION INSPECTION FEES-U | $6,809.62 |
CONSTRUCTION INSPECTION FEES | $150.00 |
CONSTRUCTION INSPECTION FEES | $150.00 |
Total Fees: | $20,628.29 |
|
|
| ______ SS MANDREL TEST |
______ SS VIDEOTAPE REVIEW |
______ SS LOW PRESSURE AIR |
______ LIME SERIES |
______ SUBGRADE UTILITY REL |
______ SULFATE TESTING |
______ SATURDAY WORK |
______ SATURDAY WORK |
______ LIME GRADATION |
______ LIME SERIES |
______ WATER DENSITIES |
______ SUBGRADE DENSITIES |
______ SANITARY SEWER DENSI |
______ PRE POUR INSPECTION |
______ SATURDAY WORK |
______ PRELIM CONST INSP |
______ FINAL CONST INSPECTI |
______ CONSTRUCTION INSPECT |
______ ENGINEERING |
______ BUILDING INSPECTION |
______ PLANNING |
______ FINAL ACCEPTANCE LET |
______ TRENCH SAFETY |
______ PRVT |
______ PRECON |
______ PAVING MIX DESIGN |
______ SS DENSITIES |
______ STORM DENSITIES |
______ WATER DENSITIES |
______ WATER-TEST |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|