|
CIVIL
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE:
|
PERMIT SUB-TYPE: COMMERCIAL DEV
|
PERMIT NO: CV-0206
|
JOB ADDRESS: 5601 WARREN PKWY FRISCO, TX 75034 |
DESC:
Frisco Medical Center Ph I |
|
OWNER:
Stonecreek Land, L.P.
5400 N. Dallas Parkwway Frisco TX 75034
|
CONTRACTOR:
RODMAN EXCAVATION, INC.
P.O. Box 597
6831 Ash Street Frisco TX
|
ISSUED DATE:
APPLIED DATE:
EXPIRED DATE:
SITE APN:C2632288
STATUS:FINAL ACCEPTANC
|
|
APPLICANT:
PBS&J
5999 Summerside Dr. Suite 202 Dallas TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CONSTRUCTION INSPECTION FEES | $7,867.71 |
PAVING ESCROW FEE | $35,829.21 |
PAVING ESCROW FEE | $12,426.99 |
PAVING ESCROW FEE | $9,813.84 |
Total Fees: | $65,937.75 |
|
|
| ______ WATER DENSITIES |
______ STORM SEWER DENSITIE |
______ SANITARY SEWER DENSI |
______ WATER PRESSURE TEST |
______ PRELIMINARY BUILDING |
______ PRELIM CONST INSP |
______ BUILDING INSPECTION |
______ ENGINEERING |
______ PLANNING |
______ PUBLIC WORKS |
______ CONSTRUCTION INSPECT |
______ FINAL ACCEPTANCE LET |
______ FINAL INSPECTION |
______ TAPE |
______ TRENCH SAFETY |
______ MANDREL |
______ AIR TEST |
______ PRVT |
______ PRECON |
______ PAVING MIX DESIGN |
______ WATER-TEST |
______ LIME SERIES |
______ SULFATE TESTING |
______ STORM DENSITIES |
______ WATER DENSITIES |
______ SUBGRADE UTILITY REL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|