|
CIVIL
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE:
|
PERMIT SUB-TYPE: ROADS
|
PERMIT NO: CV-0005
|
JOB ADDRESS: COIT IMPROVEMENTS , |
DESC:
Coit Road, Phase 2 |
|
OWNER:
City of Frisco
6859 Main Street Frisco TX 75034
|
CONTRACTOR:
Site Concrete, Inc.
PO Box 154489 Irving TX 750154489
|
ISSUED DATE:
APPLIED DATE:
EXPIRED DATE:
SITE APN:
STATUS:FINAL ACCEPTANC
|
|
APPLICANT:
City of Frisco
6859 Main Street Frisco TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
|
| ______ PRECON CONF |
______ TRENCH SAFETY |
______ PAVING MIX DESIGN |
______ WATER PRESSURE TEST |
______ SATURDAY WORK |
______ SATURDAY WORK |
______ LIME SERIES |
______ SUBGRADE UTILITY REL |
______ WATER PRESSURE TEST |
______ PAVING MIX DESIGN |
______ WATER SAMPLES |
______ WATER PRESSURE TEST |
______ WATER PRESSURE TEST |
______ WATER SAMPLES |
______ SATURDAY WORK |
______ CONSTRUCTION INSPECT |
______ FINAL ACCEPTANCE LET |
______ PLANNING |
______ ENGINEERING |
______ BUILDING INSPECTION |
______ PUBLIC WORKS |
______ BUILDING INSPECTION |
______ PLANNING |
______ ENGINEERING |
______ PRELIM CONST INSP |
______ PUBLIC WORKS |
______ CONSTRUCTION INSPECT |
______ FINAL ACCEPTANCE LET |
______ FINAL INSPECTION |
______ FINAL INSPECTION |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|