|
BACK FLOW
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/13/2018
|
PERMIT SUB-TYPE: COMM
|
PERMIT NO: BF08-0172
|
JOB ADDRESS: 8801 COLEMAN BLVD. FRISCO, TX 75034 |
DESC:
3 BF - SAKE TORO |
|
OWNER:
SAKE TORO - FRISCO, SQUARE
6136 FRISCO SQUARE BLVD STE 41 FRISCO TX 75034-3252
|
CONTRACTOR:
|
ISSUED DATE:
APPLIED DATE:2/12/2008
EXPIRED DATE:2/5/2019
SITE APN:C2567544
STATUS:APPROVED
|
|
APPLICANT:
SAKA TORO - KWANG CHOI
8849 COLEMAN BLVD #306 FRISCO TX
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
BACK FLOW FORM REVIEW | $50.00 |
BACK FLOW FORM REVIEW | $75.00 |
BACK FLOW FORM REVIEW | $25.00 |
BACK FLOW FORM REVIEW | $75.00 |
BACK FLOW FORM REVIEW | $75.00 |
BACK FLOW FORM REVIEW | $75.00 |
BACK FLOW FORM REVIEW | $75.00 |
BACK FLOW FORM REVIEW | $75.00 |
BACK FLOW FORM REVIEW | $75.00 |
BACK FLOW FORM REVIEW | $75.00 |
Total Fees: | $675.00 |
|
|
| ______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
______ BACKFLOW |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|