|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/19/2024
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B24-03368
|
JOB ADDRESS: 8506 HARRIER ST FRISCO, TX 75035 |
DESC:
3749 AC, 4706 SF, 2 STORY |
|
OWNER:
FM 3537 LLC NASH
733 8TH AVE SAN DIEGO CA 92101-6407
|
CONTRACTOR:
AMERICAN LEGEND HOMES
2540 KING ARTHUR BLVD LEWISVILLE TX 75056
|
ISSUED DATE: 9/19/2024
APPLIED DATE:9/11/2024
EXPIRED DATE:5/20/2025
SITE APN:ADD336336
STATUS:ISSUED
|
|
APPLICANT:
Liliana Moton
4400 State Highway 121 Lewisville TX 75056
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 09/20/2024 BCB | $100.00 |
1 INCH PD METER | $605.00 |
WATER METER DEPOSIT | $150.00 |
PERCENT CREDIT CARD FEE | $2.60 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,618.86 |
RESIDENTIAL FEE | $141.18 |
RESIDENTIAL MECHANICAL FEE | $135.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $214.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $1,404.00 |
WATER IMPACT FEE | $2,120.00 |
T-POLE RES 09/23/2024 RWK | $30.00 |
Total Fees: | $6,846.64 |
|
|
| ______ SET 1 PD METER |
______ T-POLE RES |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|